|
|
|
|
Nexans wishes you a happy new year 2012.
|
|
More...
|
|
|
|
|
|
This video showcases alternative structured cabling approaches to support new devices as they are added to the network.
|
|
More...
|
|
|
|
|
|
See new approaches to connect security and BAS devices to an IP network, even if the devices are more than 100m from the closet.
|
|
More...
|
|
|
|
|
|
See how selecting the right cabling media can extend the reach and improve the quality of your CCTV transmissions.
|
|
More...
|
|
|
|
|
|
This video demonstrates the speed that can be achieved using 10G for transmission instead of traditional 1G networks.
|
|
More...
|
|
|
|
|
This simple movie shows the difference when there is a fire in a room (place) with standard cables compared to a place that has our low fire hazard cables.
|
|
More...
|
|
|
|
|
Low fire hazard cables improve safety
|
|
More...
|
|
|
6/3/10
|
|
Nexans has successfully completed a new 75 km subsea power link between Pemba Island and the National Grid on mainland Tanzania.
|
|
More...
|
|
|
3/22/10
|
|
Dedicated cable laying ship has been lengthened by 12.5 metres to increase its cable handling capabilities.
|
|
More...
|
|
|
12/14/09
|
|
High voltage subsea power export cables for the world’s largest wind farm.
|
|
More...
|
|
|
|
|
|
Listen the 2004 Full Year results presentation by Gérard Hauser and Frédéric Vincent.
|
|
More...
|
|
|
|