Video library

Temporary site cables
Temporary construction cables are used during the maintance, repair and modification of overhead lines and substations. The cables act as a temporary bridge within or between cable or OHL circuits as well as providing emergency power supply as a contingency or within an emergency return to service requirement.

Temporary site cables
Temporary construction cables are used during the maintance, repair and modification of overhead lines and substations. The cables act as a temporary bridge within or between cable or OHL circuits as well as providing emergency power supply as a contingency or within an emergency return to service requirement.

Press coverage: Inauguration of Nexans High Voltage plant in Charleston, USA
The inauguration of our High Voltage plant located in Goose Creek (near Charleston), South Carolina (USA) took place on October 8, 2014.

Nexans Brings Energy to Life in South Carolina with our Newest High Voltage Plant
The inauguration of our High Voltage plant located in Goose Creek (near Charleston), South Carolina (USA) is taking place today (October 8, 2014).

Nexans breaks ground on its first high voltage (HV) cable manufacturing plant in North America
Nexans has started the construction of its first high voltage power cable manufacturing plant in North America.
Alternatives to Traditional cabling for IP devices
This video showcases alternative structured cabling approaches to support new devices as they are added to the network.
New Cabling Approaches for IP-Enabled Devices
See new approaches to connect security and BAS devices to an IP network, even if the devices are more than 100m from the closet.
Demonstrating 10GBase-T Viability
This video demonstrates the speed that can be achieved using 10G for transmission instead of traditional 1G networks.
Improve Video Quality with High-Quality Cabling
See how selecting the right cabling media can extend the reach and improve the quality of your CCTV transmissions.

How fast will you get out?
This simple movie shows the difference when there is a fire in a room (place) with standard cables compared to a place that has our low fire hazard cables.

Nexans completes subsea cable link to provide reliable power for Pemba Island in Zanzibar
6/3/10Nexans has successfully completed a new 75 km subsea power link between Pemba Island and the National Grid on mainland Tanzania.

C/S Nexans Skagerrak ready to put to sea after major conversion and upgrade project
3/22/10Dedicated cable laying ship has been lengthened by 12.5 metres to increase its cable handling capabilities.

Nexans wins 100 million Euros power cable contract for the London Array offshore wind farm project
12/14/09High voltage subsea power export cables for the world’s largest wind farm.